Year

PROJECT REFERENCE

  • Gwynt Y Mor Platform Installation (UK)
    April 2012

    Gwynt Y Mor is one of the largest offshore wind farms currently under construction in Europe.  These KimLock slings were used to aid the transportation and offshore installation of both topsides.

    Download PDF
  • Noble Duchess - Spooling of Mooring Wire (Singapore)
    February 2012

    KTL Offshore managed the spooling activities of all mooring ropes - in and out of winches. 

    Download PDF
  • E8 & F13K Offshore Transport & Installation (Malaysia)
    February 2012

    E8 and F13k Offshore Transport and Installation in Malaysia. Using KimFlex Slings and Crosby Shackles.

    Download PDF
  • ONGC D1 Field Development Subsea Project 2 (India)
    January 2012

    The D1 field is located 200km west of Mumbai.  It is a marginal field with estimated reserves of 19 million tonnes of oil.

    This project involved the installation of three well platforms and one bridge.

    Download PDF
  • Construction of S116 Jack-Up (Caspian Sea)
    January 2012

    A new high spec jack-up drilling rig is being constructed to be used in the Caspian Sea.  It will operate in water depths to 350ft and drill to subsea depths of 30,000ft. 

    Download PDF
  • Papa Terra/P-63 FPSO (Brazil)
    December 2011

    Situated 110km from the coast of Rio de Janeiro is the Papa Terra Oilfield, located on the BC-20 block of the Campos Basin in a water depth of 3,937 feet (1,200 meters).  Recoverable oil volumes range between 700 million and 1 billion barrels.

    Download PDF
  • ONGC D1 Field Development Subsea Project - Plasma (India)
    December 2011

    The D1 field is located 200km west of Mumbai.

    This project involves the installation of three well platforms and one bridge.

    Download PDF
  • Noble Discoverer - Spooling of Mooring Rope (New Zealand)
    November 2011

    KTL Offshore managed the spooling of 8 lengths of wire rope, each 76mm in diameter and 6,000 feet in length.

    Download PDF
  • ONGC D1 Field Development Subsea Project (India)
    September 2011

    The D1 field is located 200km west of Mumbai in the deep continental shelf at a depth of around 90 meters. 

    This project involves the installation of three well platforms, along with three rigid and flexible pipelines, as well as subsea cables.

    Download PDF
  • ONGC B193 Field Development Project (India)
    September 2011

    The B193 Well Head Platform is located in a block of the Bombay Offshore Basin, 60-90km from Mumbai.  The jacket installation took place in December 2011.

    Download PDF
  • Bien Dong Project (Vietnam)
    August 2011

    Bien Dong Petroleum Operating Company (Bien Dong POC), a subsidiary of the state-run Vietnam Oil and Gas Group (PetroVietnam), have started building jackets and topsides for Vietnam’s biggest-ever oilrig at MOC TINH GAS FIELD.

    Download PDF
  • MONTARA Field Development Project (Australia)
    June 2011

    The Montara oil and gas field is located in the northern territory, west of Darwin in the Timor Sea, off northern Australia.

    Download PDF
  • Kipper Tuna Turrum Project (Australia)
    May 2011

    Located off the Victoria coast in the Bass Strait, ExxonMobil Australia’s Kipper Tuna Turrum Project is currently one of the largest domestic gas developments on the Eastern seaboard.

    Download PDF
  • Gumasut J-Lay Tower Upgrade And Refurbishment (Malaysia)
    May 2011

    KTL Offshore supplied the heavy lift slings which were used for the demobilization of the J-Lay Tower from the installation vessel. The J-Lay tower was to be refurbished and upgraded prior to its installation onto a different vessel.

    Download PDF
  • North Tapti Gas Field Development Project (India)
    May 2011

    KTL Offshore provided the lifting equipment for several phases of this project - located in the Bombay Offshore Basin. The project overall included the development of four additional drilling platforms, a new natural gas processing platform and the construction of a 36-inch diameter natural gas pipeline.

    Download PDF
  • SSAO Marlim P37 FPSO Project (Brazil)
    May 2011

    Marlim is located 110km offshore from Rio de Janeiro in water depths of 650m - 1,050m. It has some 102 production wells and 50 injection wells. Over 80km of rigid pipelines and 400km of flexible lines have been laid on the field.

    Download PDF
  • SSCV Hermod Lift Project (India)
    May 2011

    All manufactured and tested by KTL Offshore in Singapore. Witnessed and certified by ABS 3rd party consultancy.

    Download PDF
  • P881 Platform & Pipe Laying Installation (Thailand)
    March 2011

    KTL Offshore supplied the heavy lift slings and grommets which were used for the installation of 11 offshore platforms and 16 subsea pipelines spanning 70 km in the Gulf of Thailand.

    Download PDF
  • Gorgon LNG Project, Barrow Island (Australia)
    March 2011

    Grommets to be used to aid in lifting the jetty.

    Download PDF
  • Mumbai High North Process Platform and Living Quarters (India)
    January 2011

    KTL Offshore was selected to supply the heavy lift package as part of a US$ 618mn contract with ONGC (India) to develop a large process platform designed for the B-193 cluster development taking place in the Arabian Sea on the continent shelf of Western India.

    Download PDF