  • BG PL Platform & Pipeline (Abu Dhabi)
    September 2010

    All manufactured and tested by KTL Offshore in Singapore. Witnessed and certified by ABS 3rd Party Consultancy.

    Download PDF
  • Selangkir/Iron Duke Development Project (India)
    August 2010

    All manufactured and tested by KTL Offshore in Singapore. Witnessed and certified by GL.

    Download PDF
  • CPOC MDD T&I Project (Thailand)
    June 2010

    KTL supplied the heavy lift slings for the T&I (transportation & installation) of the Muda C Remote Head well platform (MDD) for CPOC, a joint operating company between Petronas Carigali and PTTEPI.

    The platforms were installed in 60m water depth in the Malaysia-Thailand Joint Development Area.

    Download PDF
  • Iwaki Decommissioning Heavy Lift Project (Japan)
    March 2010

    KTL Offshore was selected to supply the complete heavy lift package for this prestigious project – the decommissioning of topsides, steel support jacket and a section of the associated 12” gas export pipeline which lay at an offshore field 40 km east of Naraha Co, Fukushima prefecture, Japan, in 150m of water.

    Download PDF
  • HD 60 Kimlock Heavy Lift (Korea)
    January 2010

    The KimLock Slings were used on the Hyundai HD-60 1800 ton Lifting-Capacity Derrick Crane Barge during an offshore lift.

    Download PDF
  • Tpao Akcakoca (Turkey)
    December 2009

    KTL Offshore supplied the heavy lift slings for the Turkish national oil company’s wellhead platform lifting in Akcakoca in the Black Sea. Unique engineering was required in the sling design to accommodate the special hook lifting arrangement at the eyes.

    Download PDF
  • LTA (Saudi Arabia)
    December 2009

    This project required KTL Offshore to manufacture and supply a total of 44 Cable Laid Slings and 14 Cable Laid Grommets for the first rigging requirement for the Long Term Agreement for the first in-Kingdom fabrication yard and offshore support base which will be used to construct offshore well platforms and pipelines. The slings and grommets were manufactured to extremely tight length tolerances which were achieved through KTL Offshore’s unique Engineered Length Control (ELC) method.

    Download PDF
  • Sarawak Shell Sdn Bhd (Malaysia)
    August 2009

    All manufactured and tested by KTL Offshore in Singapore. Witnessed and certified by ABS 3rd party consultancy.

    Download PDF
  • Moragot Hub (Thailand)
    August 2009

    Chevron 2009 Installation Campaign Project - Rigging Design for PF35-1 Moragot Hub (MGWA). 

    Download PDF
  • Chevron 2009 M25 (Thailand)
    July 2009

    All manufactured and tested by KTL Offshore in Singapore. Witnessed and certified by ABS 3rd party consultancy.

    Download PDF
  • CPOC (Thailand)
    July 2009

    Dockwise completed a major floatover installation for CPOC during July 2009.

    Dockwise performed the preparation, custom-design, fabrication, mating and mooring analyses, synchronization of transport, structural, marine and installation engineering for this complete installation floatover project.

    Download PDF
  • Vessel: C-Master (Dubai)
    June 2009

    All manufactured and tested by KTL Offshore in Singapore. Witnessed and certified by ABS 3rd party consultancy.

    Download PDF
  • Lukoil Project (Caspian)
    February 2009

    To transport and install substructures, topsides and piles offshore Russia

    Download PDF