Year

PROJECT REFERENCE

  • Tpao Akcakoca (Turkey)
    December 2009

    KTL Offshore supplied the heavy lift slings for the Turkish national oil company’s wellhead platform lifting in Akcakoca in the Black Sea. Unique engineering was required in the sling design to accommodate the special hook lifting arrangement at the eyes.

    Download PDF
  • LTA (Saudi Arabia)
    December 2009

    This project required KTL Offshore to manufacture and supply a total of 44 Cable Laid Slings and 14 Cable Laid Grommets for the first rigging requirement for the Long Term Agreement for the first in-Kingdom fabrication yard and offshore support base which will be used to construct offshore well platforms and pipelines. The slings and grommets were manufactured to extremely tight length tolerances which were achieved through KTL Offshore’s unique Engineered Length Control (ELC) method.

    Download PDF
  • Sarawak Shell Sdn Bhd (Malaysia)
    August 2009

    All manufactured and tested by KTL Offshore in Singapore. Witnessed and certified by ABS 3rd party consultancy.

    Download PDF
  • Moragot Hub (Thailand)
    August 2009

    Chevron 2009 Installation Campaign Project - Rigging Design for PF35-1 Moragot Hub (MGWA). 

    Download PDF
  • Chevron 2009 M25 (Thailand)
    July 2009

    All manufactured and tested by KTL Offshore in Singapore. Witnessed and certified by ABS 3rd party consultancy.

    Download PDF
  • CPOC (Thailand)
    July 2009

    Dockwise completed a major floatover installation for CPOC during July 2009.

    Dockwise performed the preparation, custom-design, fabrication, mating and mooring analyses, synchronization of transport, structural, marine and installation engineering for this complete installation floatover project.

    Download PDF
  • Vessel: C-Master (Dubai)
    June 2009

    All manufactured and tested by KTL Offshore in Singapore. Witnessed and certified by ABS 3rd party consultancy.

    Download PDF
  • Lukoil Project (Caspian)
    February 2009

    To transport and install substructures, topsides and piles offshore Russia

    Download PDF
  • Phase 1A Block H Gas Development (Malaysia)
    January 1970

    KimLift® Synthetic Round Slings – Deepwater Subsea Application

    BACKGROUND

    The offshore contractor selected multiple KimLift® synthetic round

    slings as their preferred choice for this Deepwater, subsea lifting
    application.

    The slings were used for the Block H Gas Development project located
    in 1300m water depth offshore Sabah, Malaysia.

    These synthetic slings were the new generation KLXB KimLift® slings
    utilizing machine braided jackets for greater protection to the load
    bearing core yarn.

    The braided jacket provides superior protection against mechanical
    damage and specifically against potential damage caused by the ROV
    gripper.

    Due to their use subsea, the slings were required to be short in length
    and yet have a high strength – the two properties combined is typically
    very difficult for a sling maker to achieve. However, the manufacturing
    process used in producing the KLXB range overcomes this problem
    and slings a short as 2.0m can be produced in high load capacity.

     

    SCOPE OF SUPPLY:

    2x KimLift® synthetic round slings KLX-170; MBL 850 MT (adjusted for bending 
    diameter) and nominal effective working length 3.00 meters.

    2x KimLift® synthetic round slings KLX-99; MBL 495 MT (adjusted for bending 
    diameter) and nominal effective working length 3.00 meters.

    2x KimLift® synthetic round slings KLX-56; MBL 280 MT (adjusted for bending 
    diameter) and nominal effective working length 3.00 meters.

    Designed and manufactured in Singapore by Future Synthetics Pte Ltd (a subsidiary of KTL Offshore Pte Ltd) 
    and tested at KTL Offshore Malaysia/Singapore to DNVGLST-N001. Witnessed and certified by ABS Consulting.

    Download PDF